Sunday 20 July 2014

Insulation & internal walls ...


The works on installation of internal walls started last week, immediately after insulation and electrical rough-ins were completed. We were offered thicker insulation batts as part of the upgrade package, hence Casaview has insulated the walls with R2.0 batts (up from standard 1.5) and the ceilings with R3.5 batts (up from standard 2.5). The R-value is the heat resistance and the minimum requirement for Sydney is R1.5 for both walls and ceilings.

No comments:

Post a Comment