Tuesday 6 May 2014

The frames are complete ...

Last Friday, I was allowed inside to see how things were progressing and had a good walk-around tour of the site. I was thoroughly informed on a number of things and was very impressed with the details such as the quality and grade of timber used for different parts of the house, the difference between full treated pine and T2 treated pine and the role of different reinforcements (metal and wooden beams).  A good photo opportunity, hence the following...
Entry
Garage
Hallway from Entry
Formal
Living
Raked Ceiling from Lounge


Plumbing for Island Bench
Alfresco

Upper Living Area

Master Bedroom, showing WIR 

Ensuite, from Master Bedroom

Bedroom 3

Bedroom 4